Cost Guides

Interior Renovation Cost Guide for Delhi NCR Flats (3BHK–5BHK)

Published 10 June 2026 · 7 min read

One of the first questions any homeowner asks before starting an interior renovation is simple: what will it actually cost? The honest answer is "it depends" — but it depends on a specific, predictable set of factors. Here's how those factors played out across our own completed projects in Ghaziabad, Noida and Gurugram.

What Actually Drives the Number

  • Unit size and layout — a 3BHK and a 5BHK aren't just "more of the same"; larger units usually mean more custom carpentry, more electrical points, and more finish area.
  • Scope: renovation vs. full turnkey — renovating an existing flat's finishes costs less than a full turnkey fit-out of a bare independent floor, which includes civil, MEP and interior from scratch.
  • Material grade — laminate vs. veneer vs. solid wood; vitrified tile vs. natural stone; these choices alone can shift a budget by 30–50%.
  • Furniture type — modular vs. loose wooden/steel furniture changes both cost and lead time.
  • Society access rules — work-hour restrictions and material-movement rules in gated societies can extend timelines, which indirectly affects labour cost.

Real Numbers From Completed Projects

ProjectUnit TypeLocationValueDuration
Apex The Kremlin3BHKGhaziabad₹20 lakh~3 months
T&T Society4BHKGhaziabad₹32 lakh~4 months
Gaurs Siddhartham4BHKGhaziabad₹40 lakh
Samridhi Grand Avenue4BHKNoida₹50 lakh~4 months
Civitech Stadia5BHKNoida₹65 lakh~6 months
Independent Floor (Advocate)Independent FloorNew Delhi₹80 lakh~6 months
Independent Floor (Business Owner)Independent FloorGurugram₹1.2 crore~12 months

Notice the pattern: cost tracks unit size and scope far more than it tracks location. A 4BHK renovation in Ghaziabad and a 4BHK renovation in Noida landed in a similar band once you account for material choices.

How to Get an Accurate Estimate for Your Flat

  1. Have a contractor visit and measure the actual space — carpet area alone doesn't tell the full story.
  2. Decide renovation vs. full turnkey scope upfront.
  3. Pick a material grade band (economy / mid / premium) before asking for quotes, so estimates are comparable.
  4. Ask for a written scope-of-work with the quote, not just a lump sum.

See our own project portfolio for photos and full details of the projects above, or request a free site visit for a quote specific to your flat.

Related Reading

Turnkey Contractor vs. Managing Trades Yourself: What Actually Changes

A clear comparison of hiring a single turnkey contractor versus coordinating civil, electrical, plumbing and interior work separately.

The Pre-Renovation Checklist: 12 Things to Confirm Before Work Starts

A practical checklist for homeowners in Delhi NCR before starting a flat or independent-floor renovation — society approvals, scope, budget and more.